프로젝트

Taean Jeongju-yeong Reclaimed Land Soil Restoration Project

Before
After

Application of Mosby is expected to recover 80% of Taean reclaimed soil within 2 years

Code of Nature made it difficult to grow crops due to salt damage and nutritional deficiencies Mosby', a moss-based soil restoration solution applied to the 6,600-square-meter section of Taean reclaimed land in ChungnamSun restoration work was carried out. After restoration, the soil grade was improved from “bad” to “good.” 80% of normal soil should be restored within 2 yearsIt is being analyzed as

This restoration First example of using Mosby in a reclaimed land environmentRo, increase in organic matter and organic carbon content, restore microbial activity, etc. The progress of rapid improvements in soil health indicatorshas been confirmed. The Taean Project is on a reclaimed land site that was difficult to restore using traditional methods The first application that demonstrated Mosby's field effectivenessAs a result, it has opened up new possibilities for soil restoration.

복원 위치
Taean-gun, Republic of Korea
복원 기간
2022. 6. 1 - 2022. 11. 30
복원 형태
Restoration area 6,600㎡
FROM THE GROUND UP

Together, we can restore the soil.
Can be restored

Looking for a real solution for nature?
Go beyond restoration—
join Code of Nature in building a sustainable future for our land.